A project manager reported the following earned value data: PV. $15,400,000 EV: $14,500,000 AC; $14,500,000 What does this mean ?

Answers

Answer 1

If PV > EV, then the project is behind schedule, and the actual cost is more than what was budgeted. If PV < EV, then the project is ahead of schedule, and the actual cost is less than what was budgeted.In the given case, PV = $15,400,000, and EV = $14,500,000. Hence PV > EV, and the project is behind schedule. But the project is still on budget because PV = AC.

Given earned value data: PV = $15,400,000, EV = $14,500,000, AC = $14,500,000Based on this data, the project manager can understand the status of the project and make a decision.

Here are the terms used in earned value management (EVM) to understand the above data:PV: It refers to the Planned Value, i.e., the budgeted cost of the work that was planned to be done. In the given data, the planned value of the project is $15,400,000.

EV: It refers to the Earned Value, i.e., the budgeted cost of the work that is completed or accomplished as of a specific date. In the given data, the earned value of the project is $14,500,000. AC: It refers to the Actual Cost, i.e., the actual cost incurred in accomplishing the work that is completed as of a specific date.

In the given data, the actual cost of the project is $14,500,000.The below is the formula that calculates these three values. PV = the sum of all budgeted costs up to a given date EV = the sum of all the actual costs of work up to a given date AC = the sum of all the actual costs of work up to a given date. If PV = EV = AC, then the project is running on budget.

If PV > EV, then the project is behind schedule, and the actual cost is more than what was budgeted. If PV < EV, then the project is ahead of schedule, and the actual cost is less than what was budgeted.In the given case, PV = $15,400,000, and EV = $14,500,000. Hence PV > EV, and the project is behind schedule. But the project is still on budget because PV = AC.

To learn more about actual cost, visit:

https://brainly.com/question/4557688

#SPJ11


Related Questions

anyone know PNC banks atm fees?

Answers

Answer:

$500 i think is the answer

Explanation:

hope it helps

$500 i think just try it

What are references?

Answers

Answer:

Reference is a relationship between objects in which one object designates, or acts as a means by which to connect to or link to, another object. The first object in this relation is said to refer to the second object. It is called a name for the second object.

Explanation:

Answer:

Reference is a relationship between objects in which one object designates, or acts as a means by which to connect to or link to, another object

Explanation:

process
of dividing a large market into smaller groups ​

Answers

Answer:

Market segmentation

Explanation:

Market segmentation, the process of dividing a larger market into smaller pieces based on one or more meaningful, shared characteristics, is a way of life for almost all marketers in both consumer and business-to-business markets.

can you please mark me 'Brainliest'? thanks

To be more efficient in formatting tasks, it is important to follow best practices when designing type. Which scenarios
show the applications of best practices when designing type? Check all that apply.
Joe uses an 8-point font.
Angelo uses one type of font in his document.
Jeremiah underlines words for emphasis.
Akilah indents and adds space between her paragraphs.i
Amy uses the hyphenation feature in her justified paragraphs.

Answers

Answer:

2 and 5

Explanation:

Scenarios that show the applications of best practices when designing type is

Angelo uses one type of font in his document.Amy uses the hyphenation feature in her justified paragraphs.

Thus the correct option is B and E.

What is formatting?

Document formatting describes the way a document is set up. It involves requirements on how a document should look. Formatting makes documentation appear professional and appealing.

While making any document it is required to choose one type of font which makes it a structured and systematic manner. various styles of font may distract the focus of the reader while taking look at the document.

Use of the hyphenation feature in her justified paragraphs to make it more clear and more structured to achieve a more uniform line length, Word's hyphenation feature enables the insertion of line breaks and hyphens within words.

Therefore, options B and E are the appropriate answer.

Learn more about formatting, here:

https://brainly.com/question/22444669

#SPJ6

Trisha is working on putting together pictures of all of the best wedding cakes that
she has decorated and designed throughout her culinary career. She is hoping this compilation will help her get a job at the catering company that she has been wanting to work at for years. What is Trisha putting together to show her potential employer?
A. portfolio
B. resume
C. work visa
D. letter of intent

Answers

Answer:

A. Portfolio Is the Anwser to the Question

A drug company that makes pain relief medication with an advertising slogan, "targeted relief for pain," is using which type of segmentation strategy that directly focuses on a specific consumer problem?.

Answers

Needs segmentation strategy is used by the drug company.

Segmentation is a form of sorting: Arranging objects in a systematic way. once objects are sorted into awesome companies (segments) based on a sure criterion, specific moves can then be taken based on that criterion. similarly, marketplace segmentation includes the sorting of the market.

Market segmentation is typically divided into four organizations: demographic, geographic, behavioral, and psychographic. Every segmentation method offers unique advertising and marketing answers, mainly when segments are mixed.

Not unusual examples of market segmentation encompass geographic, demographic, psychographic, and behavioral. Groups that understand marketplace segments can prove themselves to be powerful marketers while incomes a more go back on their investments.

Learn more about business here: https://brainly.com/question/24448358

#SPJ4


Which of the following is not an example of professional behavior
?

Answers

What are the answers?

an active licensee fails to renew her third two-year license before the expiration date on the license. the license will:

Answers

An active licensee fails to renew her third two-year license before the expiration date on the license. The license will expire, and the licensee will be required to apply for a new license, take the pre-licensing coursework, and pass the licensing exam again to practice real estate activities.

What happens when an active licensee fails to renew her third two-year license before the expiration date on the license?

A real estate license must be renewed every two years, or it will expire on the date shown on the license. If the active licensee fails to renew the third two-year license before the expiration date on the license, the license will expire, and the licensee will be required to apply for a new license, take the pre-licensing coursework, and pass the licensing exam again to practice real estate activities.

The renewal date for a license is always the last day of the licensee's birth month. The Department of Licensing sends a renewal notice to the email address on file at least 30 days before the renewal date. If the licensee has not received the renewal notice within 20 days of the renewal date, she should contact the department.

To know more about license visit:

https://brainly.com/question/32503904

#SPJ11

1. Your friend asks to borrow $50 and offers to pay you back with interest. What factors
would you consider in your decision to accept or decline their request?

Answers

The factors that you have to think about would before giving out the loan would be the following:

The loan periodThe ability to pay back the loanThe interest that is on the loanHow the money is to be returned.

What is a loan?

This is the term that is used to refer to an amount of money that would be given to a person that is the borrower by the lender for a period pf time and for them to pay back with interest.

To be able to determine if you are to give out a loan, you have to take the ability of the person to pay you back the amount as a fator.

Also you have to check the character of the person that you are to loan the money to.

Read more on loans here: https://brainly.com/question/26913200

#SPJ1

T or F: If the output effect from increased production is larger than the price effect, then an oligopolist would increase production.

Answers

The statement ''If an increase in output produces a greater effect on output than on price, then an oligopolist would increase output'' is true because by increasing output the positive impact of selling more units outweighs the possible negative impact of a lower price.

If the output effect, which refers to the increase in revenue from producing and selling more units, is greater than the price effect, which refers to the decrease in revenue from lowering the price to increase sales, then it would be profitable for an oligopolist to increase output.

However, oligopolists must also consider the potential reaction of their competitors and the effect on market prices before making output decisions.

Learn more bout oligopoly at https://brainly.com/question/29567698

#SPJ11

A discretionary cost can best be described by which of the following statements? a. The level of uncertainty of deviations of actual amounts from expected results is greater for discretionary costs than for engineered costs. b. Discretionary costs result from cause-and-effect relationships between outputs and inputs. c. Discretionary costs are added to or subtracted from in a step fashion. d. Discretionary costs are variable costs incurred in relation to capacity issues.

Answers

A discretionary cost can best be described by statement the level of uncertainty of deviations of actual amounts from expected results is greater for discretionary costs than for engineered costs. Option A is correct.

Discretionary costs are expenses that are not directly tied to specific production levels or outputs, and management has more flexibility in deciding how much to spend on them. These costs often include items such as advertising, research and development, or employee training.

In contrast, engineered costs have a clear cause-and-effect relationship between inputs and outputs (statement B), are not added or subtracted in a step fashion (statement C), and are not specifically related to capacity issues (statement D).

Therefore, option A is correct.

Learn more about discretionary cost https://brainly.com/question/28587136

#SPJ11

Requiring managers to prepare the budgets from scratch or zero-base may help them to overcome the problem of:

Answers

Answer: Excessive cost

Explanation:

Zero-based budgeting is the sort of budgeting where when income is subtracted from expenses it gives zero. This sort of budgeting puts a measure of the expenses, it ensures the expenses matches the income. The purpose of the budget plan is to justify expenses and optimize cost, thereby look out for cost effective ways to plan and avoid inflated budgets. It primarily guides against excessive costs on projects.

Which business application is associated with the technological development of local area networks and client/server computing?A) transaction automation (e.g., payroll)B) desktop automation (e.g., word processing)C) industrial system automation (e.g., supply chain management)D) workgroup automation (e.g., document sharing)

Answers

The development of local area networks and client/server computing paved the way for workgroup automation and collaborative technologies that continue to play a crucial role in modern business operations. option (D) Workgroup automation.

D) Workgroup automation (e.g., document sharing) is the business application that is associated with the technological development of local area networks and client/server computing.

The development of local area networks and client/server computing enabled the sharing of resources, data, and applications among multiple users in a workgroup or team.

This led to the development of workgroup automation tools such as document sharing, collaborative software, and project management systems that allowed team members to work together more efficiently and effectively.

Through workgroup automation, teams could collaborate on documents and projects in real-time, reducing the need for email exchanges or physical meetings. This improved communication and coordination among team members, leading to increased productivity and faster project completion.

Overall, the development of local area networks and client/server computing paved the way for workgroup automation and collaborative technologies that continue to play a crucial role in modern business operations.

To know more about local area networks refer here:

https://brainly.com/question/15227700#

#SPJ11

What is the meaning and there difination of 3 p's?

Answers

If you want your business to succeed, you must prioritize three key factors: people, process, and product. The three Ps, as they're commonly referred to, provide the best return on investment because they serve as the foundation for everything your company does.

The three Ps stand for People, Planet, and Profit, also known as the triple bottom line. The role of sustainability is to protect and maximize the benefits of the three Ps. People are taken care of by green programs. The term refers to a classification that began with the four Ps: product, price, placement, and promotion and has since grown to include Product, Price, Promotion, Place, People, Packaging, and Process.

To learn more about business, click here.

https://brainly.com/question/8119526

#SPJ4

Are critical regions on code sections really necessary in an SMP
(symmetric multiprocessor) operating system to avoid race
conditions or will mutexes on data structures do the job as
well?

Answers

Critical regions and mutexes serve different purposes in managing concurrent access to shared resources in an SMP operating system.

Critical regions refer to specific sections of code where shared resources are accessed, and it is crucial to ensure that only one thread or process can execute within that section at a time. By using techniques like locks or synchronization primitives, critical regions can be protected to prevent race conditions and maintain data consistency. Mutexes, which are mutual exclusion locks, are commonly used to implement critical regions. Mutexes alone can effectively protect critical regions and prevent race conditions, as they enforce mutual exclusion and ensure that only one thread can hold the lock and access the shared resource at any given time.

learn more about:- SMP operating system here

https://brainly.com/question/32195270

#SPJ11

Culture, demand and competition impose saturation limits above which no amount of advertising spending can increase sales. True or false.

Answers

True that culture, demand, and competition impose saturation limits above which no amount of advertising spending can increase sales.

It is true that culture, demand, and competition impose saturation limits above which no amount of advertising spending can increase sales. Advertising can help increase brand awareness, familiarity, and preference among consumers, but there comes a point where the market becomes saturated, and additional advertising spending does not lead to significant increases in sales. The saturation limit may vary depending on the product or service, the industry, and the target audience. Therefore, it is crucial for businesses to understand their market and determine the optimal advertising budget to achieve their sales goals.

learn more about "Sales":- https://brainly.com/question/25586322

#SPJ11

What is the W-4 form used for?
filing taxes with the federal government
determining the amount of money an employee has paid out in taxes
calculating how much tax should be withheld from a person's paycheck
calculating how much income was paid in the previous year

Answers

Answer:

C. calculating how much tax should be withheld from a person's paycheck

Explanation:

In order to ensure that, all employees pay taxes on the income earned throughout the year, the internal revenue service (IRS) has made it compulsory and mandatory for all employers to make available a W-4 Form to all their employees, so as to enable these employees fill out how much income tax is to be withheld from their respective paycheck in relation to their filing status.

Hence, a W-4 form is used for calculating how much tax should be withheld from a person's paycheck and submitted to the internal revenue service (IRS).

Additionally, any employee who defaults in the payment of his or her income tax would be faced with stiff penalties such as failure-to-file, paying a fine etc.

Answer:

its c

Explanation:

just took the unit test on edge

Question 5 of 10
When gathering information, which of the following tasks might you need to
perform?
A. Apply standards, such as measures of quality, beauty, usefulness,
or ethics
B. Seek out ideas from others and share your own ideas
C. Study objects, conduct lijsts, research written materials, and ask
questions
D. Fill out forms, follow procedures, and apply math and science
SEN

Answers

I’m pretty sure the answer is option C

A strategy in which a player cooperates until the other player defects and then defects until the other player cooperates again.

Answers

Titfor-tat is a strategy in which player cooperates until other player defects and then defects until other player cooperates again.

What is a strategy ?

In the face of uncertainty, a strategy is a general plan to carry out one or more long-term or overall aims. The phrase was first employed in the 6th century C.E. in terms of Eastern Roman terminology, and it wasn't until the 18th century that it was translated into Western vernacular languages in the sense of the "art of the general," which included a number of subsets of skills such as military tactics, siegecraft, logistics, etc. From that point on, and up until the 20th century, the word "strategy" came to denote "a comprehensive manner to try to advance political aims, including the threat or actual use of force, in the dialectic of wills" in military battle, in which both the opponents interact.

To learn more about strategy , visit:

https://brainly.com/question/15860574

#SPJ4

Shibo deposits a $400 check in Collegiate Bank. The reserve requirement is 20%. If Collegiate Bank loans out the maximum possible, then which describes Collegiate Bank's balance sheet

Answers

Collegiate Bank's balance sheet would show that it has loaned out the maximum possible while still maintaining the required reserve amount to comply with the reserve requirement set by the central bank.

If Shibo deposits a $400 check in Collegiate Bank and the reserve requirement is 20%, then Collegiate Bank is required to hold a reserve of $80 (20% of $400) and can loan out the remaining $320.

Assuming Collegiate Bank loans out the maximum possible, its balance sheet would show the following:

Assets:

Cash reserves: $80

Loans and other assets: $320

Liabilities:

Deposits: $400

The $80 cash reserve is shown as an asset on the balance sheet, while the $320 loan is also shown as an asset. The $400 deposit is shown as a liability on the balance sheet, representing the bank's obligation to Shibo.

To learn more about reserve requirement, visit here

https://brainly.com/question/30053423

#SPJ4

which of the following categories describes a project whose objective it is to create the next iteration of an existing product already on the market? derivative project r

Answers

Scrum is one of the project management approaches in the agile framework that uses an iterative process to create product delivery.

What exactly is project management?

The task of regulating and controlling various projects in an efficient manner is referred to as project management.

Scrum is the agile method that can be used by management when they want to make an iterative and incremental delivery of any product. This method enables team members to work efficiently while remaining perfectly adaptable to any change.

As a result, the Scrum approach is the agile framework technique used for product delivery in an iterative process.

Learn more about the project management here:

https://brainly.com/question/17313957

#SPJ4

These bonds are collateralized securities with first claims in the event of bankruptcy.These bonds are not backed by any physical collateral. They are backed by the reputation and creditworthiness of the issuing company.These bonds are considered the riskiest of all corporate bonds and thus offer the highest interest rates.Based on your understanding of bond ratings and bond-rating criteria, which of the following statements is true?- An indenture is a legal document that details the rights of bondholders. If the indenture includes a sinking funds provision, the bond will have less default risk.- An indenture is a legal document that details the rights of bondholders. If the indenture includes a sinking funds provision, the bond will have more default risk.

Answers

The legal instrument known as an indenture outlines the bondholders' rights. The bond will have a higher default risk if the indenture has a sinking money clause.

What is indenture?

An indenture is a written agreement that enshrines or protects a debt or purchase obligation. As used historically, it referred to the status of an indentured servant; when used now, it is a tool employed in commercial debt or real estate transactions. Indentured servants were people who agreed to give up their labour for a four to seven-year period in exchange for travel to the New World. Indentured servants were essential to the growth of the tobacco economy in the Chesapeake colonies in the 17th century as they made up the majority of English immigrants there.

To learn more about indenture click,

https://brainly.com/question/29341101

#SPJ1

1. Define Trade, Import and Export

2. List items the U.S. imports and exports.

Answers

Answer:

food and clothing

Explanation:

import is to bring things from a different country for sale. export is to give things to a different country or place for sale. trade is to transfer or exchange something from a different country.

The table shows the terms of a fixed-rate mortgage.
Which accurately describes the terms of this mortgage? Check all that apply.

The homeowner is borrowing $360,000.
The monthly interest rate is 4 percent.
Monthly payments must be made for 30 years.
The annual interest rate is 4.8 percent.
The homeowner is borrowing $200,000.
Monthly payments must be made for 360 years.

The table shows the terms of a fixed-rate mortgage.Which accurately describes the terms of this mortgage?

Answers

The fixed-rate mortgage concept is used in home loans. Monthly payments for 30 years, the interest rate is 4.8%, and borrowing $200,000.

What is a fixed-rate mortgage?

It is usually used in home loans with a fixed interest rate during the term of the loan. It is beneficial because once the rate of interest is fixed it is not influenced by the increase in the rate in the future.

C - Monthly payments for 30 years.

D - The interest rate is 4.8 % annually

E -  borrowing $200,000.

Therefore, options C, D, and E explain the fixed-rate mortgage.

Learn more about  fixed-rate mortgages here:

https://brainly.com/question/2726838

when a country such as the united states exports subsidized grains, it hurts a developing country importing the grain by

Answers

When a country such as the United States ex-ports subsidized grains, it hurts a developing country import-ing the grain by decreasing pro-duction of the grain in the deve-loping country.

Grain pro-duction in the United States has decr-eased since 1990, partly beca-use the amo-unt of water used for irrigation has dec-reased during the same period.

What is a developing country?

A developing country also call-ed a less devel-oped country or emerging market has a low-er gross domestic product (GDP) than deve-loped countries, with a less mature and sophisticated eco-nomy. Micronesia, Sudan, and Cambodia are exam-ples of developing countries that have faced hard-ships on their path to be-coming fully deve-loped countries.

To know more about United States click below:

brainly.com/question/2396046

#SPJ4

Question 22 of 29
Match each type of good below with an example of that type of good.
Merit good
Public good
Individual good
?
?
?
Education
School buildings
Textbooks
SUBMIT

Answers

Merit good: Education

Public good: School buildings

Individual good: Textbooks

Merit goods are goods or services that are considered beneficial for individuals or society as a whole, even if they may not be fully recognized or demanded by individuals in the market. Education is an example of a merit good because it provides long-term benefits to both individuals and society by improving knowledge, skills, and overall human capital. The government often intervenes to ensure the provision of education as it is seen as essential for the well-being and progress of society.

Public goods are goods or services that are non-excludable and non-rivalrous in consumption, meaning that once they are provided, they are available to all and one person's consumption does not diminish the availability for others. School buildings can be considered as public goods because they can be used by multiple individuals simultaneously without exclusion. They provide a shared infrastructure for educational purposes that benefits the community as a whole.

Individual goods are goods that are rivalrous in consumption and can be excluded from others. Textbooks are an example of individual goods as they can be owned by individuals and used exclusively by them. Each textbook has a limited supply and can only be used by one person at a time. Access to textbooks can be restricted, and individuals need to acquire their own copies.

In summary, education is a merit good as it benefits individuals and society, school buildings are public goods as they provide shared infrastructure, and textbooks are individual goods as they can be owned and used exclusively by individuals.

for more such questions on Merit good

https://brainly.com/question/22659041

#SPJ8

Valerie wants to buy a home in the suburbs, but she only has enough money to make a 17% down payment. The lender tells her that, until she saves enough to make at least a 20% down payment, she will have to wait to purchase. Evaluate if Valerie's lender is correct, and why/why not.

Answers

Answer:

Valerie's lender is wrong.

Explanation:

Valerie's lender is wrong. For most loans she should have the option of purchasing PMI  if she can't make 20% down payment.

1. Define the oscopy approach in PCS coding.
2. Code the following scenario dividing the codes appropriately into the mom and baby charts: 29-year-old female presents for delivery. This is her third pregnancy. She is at 39 weeks of gestation. This is a normal pregnancy. After a normal delivery, she gives birth to a single liveborn. The little boy is circumcised on the second day without incident. Both mom and baby are discharged in good health.
3. Code the following scenario dividing the codes appropriately into the mom and baby charts: 36-year-old female presents for delivery. This is her first pregnancy. She has had a normal pregnancy without incident. She is 37 weeks gestation. This is a twin pregnancy. Baby A is delivered vaginally with low forceps and Baby B by C section. Both babies are fine.
4. Code the following scenario: 40-year-old multigravida presents for vaginal delivery in week 41. No problems during delivery. Single liveborn.
5. Code the following scenario: 26-year-old primigravida presents in week 38. Second-degree perineum tear. Single liveborn.
6. Code the following scenario: Baby born via C-Section transferred to Children's Hospital for Myelomeningioma with hydrocephalus. Code for Children's hospital.

Answers

1. Oscopy approach: Surgical instrument insertion method - open or percutaneous. 2. Mom: Normal delivery. Baby: Liveborn, circumcision. 3. Mom: Vaginal delivery with low forceps. Baby A: Vaginal delivery. Baby B: C-section. 4. Vaginal delivery of single liveborn at week 41. 5. Vaginal delivery, second-degree perineum tear, single liveborn. 6. Children's Hospital: Transfer for C-section-born baby with myelomeningioma and hydrocephalus. Code accordingly.

1. The term "oscopy" in PCS coding refers to the approach used during a surgical procedure. It is used to describe the method by which a surgical instrument or device is inserted into the body. The approach can be classified as either "open" or "percutaneous." An open approach involves making a larger incision to access the target area directly, while a percutaneous approach involves inserting instruments through the skin using a minimally invasive technique. The choice of approach depends on the specific procedure and the surgeon's preference.

2. For the given scenario, dividing the codes appropriately into the mom and baby charts would involve assigning diagnosis and procedure codes for each individual. In the mom's chart, you would code for the normal delivery and any relevant procedures or conditions related to the mother. In the baby's chart, you would code for the liveborn status, circumcision, and any other relevant procedures or conditions related to the baby.

3. In this scenario, coding appropriately into the mom and baby charts would involve assigning diagnosis and procedure codes for each individual. In the mom's chart, you would code for the normal pregnancy, twin pregnancy, vaginal delivery with low forceps, and any relevant procedures or conditions related to the mother. In the baby's chart, you would code for the C-section delivery, twin status, and any relevant procedures or conditions related to the babies.

4. For this scenario, the coding would involve assigning diagnosis and procedure codes for the vaginal delivery of a single liveborn baby in week 41 of gestation. The specific codes would depend on any additional procedures or conditions that may be present during the delivery.

5. In this scenario, the coding would involve assigning diagnosis and procedure codes for the perineum tear and the vaginal delivery of a single liveborn baby in week 38 of gestation. The specific codes would depend on the severity of the tear and any additional procedures or conditions that may be present during the delivery.

6. For the scenario involving the baby's transfer to Children's Hospital for myelomeningioma with hydrocephalus, you would need to code the diagnosis and any relevant procedures or conditions associated with the baby's condition. The specific codes would depend on the details provided in the scenario and the coding system used (such as ICD-10-CM for diagnosis coding and/or CPT or HCPCS for procedure coding). The codes should accurately reflect the baby's diagnosis and the reason for the transfer to Children's Hospital.

Learn more about gestation here:

https://brainly.com/question/31762978

#SPJ11

Marla is a buyer at a major corporation. Although she is authorized to make purchasing decisions on her own, she often seeks the input of trusted colleagues before settling on a decision. What type of buying center does Marla participate in

Answers

Answer:

Consultative

Explanation:

I did this question

How do landlords choose tenants?

Answers

Most landlords base their selection of tenants on a tenant's past rental history, credit history, and capacity to pay rent.

What is credit?

In general, credit is an agreement between a loan and their lender. Creditworthiness as well as credit score are other terms that can be used to describe something or someone. A credit might even increase liabilities or cut assets in addition to lowering expenses or boosting earnings.

What is a credit score?

a description of a credit score. A fico score is really a statistical evaluation of a consumer's creditworthiness based on their credit history. Lenders use credit scores to assess a borrower's likelihood of making debt repayments.

To know more about credit score visit:

brainly.com/question/1475993

#SPJ4

Other Questions
Inclined tube manometer can be used to measure small pressure differences accurately True False Question 5 We can neglect the effect of elevation changes on the pressure for stationary gases in the tanks and pipes, however if the elevation changes are in the order of thousands of feet then we must consider the variation of specific weights and hence the pressure changes. True False Question 6 Piezometer tube can measure the pressure of gas while manometer tube is only suitable for measuring liquid True False Question 7 For fluids at rest, the pressure gradient in the vertical direction at any point in the fluid depends only on the A of the fluid at that point. When a person goes on a diet, do they really want to lose weight or mass?Need answer asap According to the hierarchal classification of a select group of organisms given below, which two organisms are most closely related according to Linnaean taxonomy and why? The image depicts a classification chart with Kingdom Animalia at the top, followed by Phylum Chordata, then Class Mammalia, then Order Carnivora, followed by three branches. The first branch at the highest level lists Felidae, followed by Felis and Panthera. Felis branches into catus and paradali. Panthera has a single branch called pardus. The second branch descending from Order Carnivora is called Canidae. Canidae branches into a single group, Canis. Canis has two branches, familiaris and lupus. The third branch descending from Order Carnivora is called Ursidae. A single branch descends from Ursidae called Ursus. Ursus has two branches, arctos and horribilus. Canis familiaris and Felis catus, because they belong to the same class Felis catus and Panthera pardalis, because they belong to the same family Panthera pardus and Ursus horribilus, because they belong to the same order Ursus arctos and Canis lupus, because they belong to the same genus. The streets of Tokyo blank bright. Which of the following best describes the internal political turmoil that contributed to the decline of the Byzantine Empire?A. A group of peasants banded together in an attempt to overthrow the imperial family and become the ruling class.B. Church leaders fought with the emperors over who ruled the empire.C. Co-empresses fought over which one was the true emperor.D. The Macedonian dynasty and the Powerful fought over land and labor. What is the name of the piece above? what is the volume of a pyramid? The entry of additional firms in a competitive market will: (1) shift the industry supply curve to the left. (2) shift the industry demand curve to the left. (3) shift the industry demand curve to the right. (4) shift the industry supply curve to the right. Select all the ratios that are equivalent to 8:6A. 4:3B. 6:8C. 16:12D. 10:18E: 7:5 Mr. Roush asked students to factor the expression 56x-8. What is the correct factored expression that is equivalent to the original? People with _____ disorder have severe stress about being in situations involving other people where they may face scrutiny.posttraumatic stressseparation anxietysocial anxietyobsessive-compulsive The sum of two numbers is 52. The greater number is 4 more than the smaller number. Which equation can be used to solve for the smallernumber? (5 points)aXI- (x + 4) - 52bX + (x + 4) - 52X(X + 4) - 52x(x - 4) - 52 Al's Cardboard produces cereal boxes and uses the expression 16x2+56x+24 to determine the volume of each box. The cereal box below was produced by Al's Cardboard and has a width of 8 centimeters (cm). How many grams of carbon are there in 100 g of carbon dioxide? Show your work. Working alone, Darryl can oil the lanes in a bowling alley in ten hours. Ming can oil the same lanes in eight hours. Find how long it would take them if they worked together. Round to the nearest tenth.(Part 1 of asking for help) T/F. The itoa function is similar to atoi but it works in reverse. junk bonds, bonds with a low bond rating, are also known as A very small percentage of African Americans in the 13 Colonies were A. classified as free citizens B. slaves C. Indians a spring hung vertically is 20 cm long when no mass hangs from it. when a 2 kg mass is attached, the spring hangs 50 cm. what is the spring constant? which of the following stimulates an immune response only when it is attached to a large carrier molecule?