ou are using earned value analysis to track your project's progress. In your project, earned value is higher than planned value and actual value. That means the project is _____ schedule and _____ budget.

Answers

Answer 1

Answer:

B. ahead of; under

Explanation:

Earned value analysis is the process to check the status of the project and the analysis, evaluation is to be done. It can be done between the earned value with the actual cost incurred and with the planned value

Here Planned value refers to the value i.e. to be permitted and to be completed within the prescribed time. Here earned value is compared with the planned value to check the variance schedule of the project

Here the actual value is the value that is actually spent or incurred till date. Here the earned value compared with the actual value so that any variance related to cost could be checked

And, the earned value is the value of the work completed till date. It could be in terms of costing and scheduling.

So if the earned value is more than the planned value and the actual value so the project is ahead and it is under budget

hence, option B is correct


Related Questions

Which scenario describes the highest level of productivity?

A. Producing 50 chairs using resources that cost $400
B. Producing 15 chairs using resources that cost $150
C. Producing 5 chairs using resources that cost $100
D. Producing 100 chairs using resources that cost $200

Answers

The scenario that describes the highest level of productivity is option D. Producing 5 chairs using resources that cost $100. Calculating the highest productivity:

For A. The cost should be $400 for 50 chairs so per chair should be = $400 ÷ 50 = 8. For B. The cost should be $150 for 15 chairs so per chair should be = $150 ÷ 15 = 10. For C. The cost should be $100 for 5 chairs so per chair should be = $100 ÷ 5 = 20. and For D. The cost should be $200 for 100 chairs so per chair should be = $200 ÷ 100 = 2

What is productivity?

Productivity is the efficiency of production of goods or services expressed by some measure. Measurements of productivity are often expressed as a ratio of an aggregate output to a single input or an aggregate input used in a production process, i.e. output per unit of input, typically over a specific period of time.

Therefore, the correct answer is option D.

learn more about productivity: https://brainly.com/question/2992817

#SPJ1

Three years ago, Cornelius Matthews purchased 500 shares in the Vanguard Dividend Growth fund - a Morningstar five-star fund that invests in corporations that are currently paying dividends and is a fund that will provide a steady stream of dividend income. His rationale fort choosing this fund was that he wanted a fund that was conservative and highly rated. Each share in the fund cost $22. At the end of the three years, he received income dividends and capital gain distributions that total $3.62 a share for the three-year period. At the end of the three years, the shares in the fund were selling for $27.

How much did Mr. Matthews invest in this fund?

A$11,000
B$13,500
C$5.14
D$3.62

Answers

Mr. Matthews' investment in the Vanguard Dividend Growth fund was (A) $11,000

To determine how much Mr. Matthews invested in the Vanguard Dividend Growth fund, we need to calculate the cost of the initial investment of 500 shares at $22 per share:

500 shares x $22 per share = $11,000

Therefore, Mr. Matthews invested $11,000 in the fund.

We are also told that Mr. Matthews received income dividends and capital gain distributions that total $3.62 per share for the three-year period. To determine the total amount of dividends and distributions received, we can multiply $3.62 per share by 500 shares and by 3 years:

$3.62 per share x 500 shares x 3 years = $5,430

Therefore, Mr. Matthews received $5,430 in income dividends and capital gain distributions over the three-year period.

Finally, we are told that the shares in the fund were selling for $27 at the end of the three years. To determine the value of Mr. Matthews' investment at the end of the three years, we can multiply the current share price by the number of shares he owns:

500 shares x $27 per share = $13,500

Therefore, Mr. Matthews' investment in the Vanguard Dividend Growth fund was $11,000, and the value of his investment at the end of the three years was $13,500.

For more such question on investment

https://brainly.com/question/1305349

#SPJ11

In which situation would a certificate of deposit (CD) be the best banking choice?


A. Samuel is setting money aside but still needs emergency access to it.
B. Hafsa wants a guaranteed return, and won’t need the money for several years.
C. Darren is looking for an investment that has a very high interest rate.
D. Raj is looking for an investment with a fast return so he can reinvest.

Answers

In this situation a certificate of deposit (CD) would be the best banking choice is Darren is looking for an investment that has a very high interest rate.

In the best banking choice, if you want a safe investment with a higher interest rate than a regular savings account.

A certificate of deposit is issued t a discount given at face value. It is similar to an FD, certificate of deposit aims to denote in writing that you have deposited money in the bank for a fixed  period and the bank would pay you interest- based on the amount and the period of your deposit.

To know more about investment here,

https://brainly.com/question/15353704

#SPJ1

You call a coworker to see if they can come help you solve a problem

Answers

yes/true/correct/not false

If government regulations are enforced to reduce corruption, then: the demand for investment will fall. businesses would lower their investment . the demand for loanable funds will shift left. the demand for loanable funds will shift right.

Answers

If government regulations are enforced to reduce corruption, then: c. the demand for loanable funds will shift left.

What is government regulations?

Government laws that are successfully put into practise to combat corruption enhance the business climate and boost economic confidence.

As a result, companies are likely to become more dependable and trustworthy, which will reduce the demand for loanable cash. Businesses might not need as much outside funding if there is less corruption to decrease the risks brought on by corrupt practises or to get around obstacles to doing business.

Therefore the correct option is C.

Learn more about government regulations here:https://brainly.com/question/17084491

#SPJ1

Explain what cybersecurity is and which agencies you can go to in order to ask for help​

Answers

Answer:

Cybersecurity refers to the practice of protecting computer systems, networks, and data from unauthorized access, breaches, and attacks. It involves implementing various measures, such as encryption, firewalls, and vulnerability assessments, to ensure the confidentiality, integrity, and availability of digital information. If you need assistance or want to report cybersecurity incidents, there are several agencies you can turn to for help. In the United States, you can contact the Federal Bureau of Investigation (FBI), which investigates cybercrime, or the Cybersecurity and Infrastructure Security Agency (CISA), which focuses on securing critical infrastructure and promoting cybersecurity awareness. Additionally, you can reach out to your local law enforcement agency, as well as private organizations and cybersecurity companies that offer incident response services and support.

Explanation:

According to Dr. Ridel's Levels of Critical Thinking in Chapter 1, what level of critical thinking applies to your current status? Discuss how you will use the "8-Step process to critical thinking" in your personal and professional life. Provide examples to support your answers.

Answers

Answer:

how to write it inthe morning and evening so much more than happy

in preparation of standard cost we consider what situation macroeconomics or microeconomics???​

Answers

When preparing standard costs, we primarily consider microeconomics, which is the study of the behavior of individual consumers, firms, and industries. Standard cost is the estimated cost of producing a unit of product or service, based on historical data and budgeted costs.

It is used as a benchmark to compare actual costs with expected costs and to analyze the variances between them. In order to determine standard costs, we need to consider the cost of each individual input such as direct materials, direct labor, and overheads. This analysis is done at the microeconomic level because it involves the behavior and decision-making of individual firms and their interactions with suppliers, customers, and competitors.

The macroeconomic factors such as inflation, interest rates, and unemployment rates may also have an impact on the cost of production but these are generally outside the scope of standard cost analysis. Therefore, while macroeconomics can indirectly influence the cost of production, the focus of standard cost analysis remains on the microeconomic factors that affect the cost of individual inputs.

Overall, standard cost preparation involves a detailed microeconomic analysis to determine the estimated cost of producing a product or service, which is then compared with the actual costs to identify any variances and improve the cost efficiency of the firm.

For more such questions on standard costs

https://brainly.com/question/17177941

#SPJ11

What is a sum of money that is borrowed and is expected to be paid back with interest?

Answers

The sum of money that is borrowed and is expected to be paid back with interest is called debt.

Explanation: when someone borrows money from someone else or even from the bank it is done on the condition that the money would eventually be paid back in a certain period of time with an interest payment
a sum of money that is borrowed and is expected to be paid back with interest is a loan

Why is it important to pay more than the minimum payment on your credit card each month?

Answers

Answer:

so you dont have to pay as much next month

Explanation:

Jeremy has been asked by his manager to begin drafting a report on last year’s sales figures. When he’s midway through the report, a co-worker stops by and asks if Jeremy will help him with a problem she has on her project. Jeremy also needs to respond to a number of emails before the end of the day. He is able to accomplish all these tasks. Which positive workplace behavior has he demonstrated?

Answers

Answer:

To me Jeremy is cooperating with and collaborating with others.

Explanation:

Answer:

Adaptability A P E X

Explanation:

Two firms Apple and Samsung in the smart phone market have combined demand given by Q = 200 – P. Their total costs are given by TC Apple = 4 Q Apple + Q 2 Apple and TC Samsung = 4 Q Samsung + Q 2 Samsung . If they cannot successfully collude and instead produce where the market price equals marginal cost, their total output will be

Answers

The total output of both smart phones company would be 98.

How to solve for output

The combined demand is

Given, Q = 200 - P

Therefore P = 200 - Q

Q = Qa + Qs

P = 200 - QA - QS

For apple, We have

4 Q Apple + Q² Apple

and

4 Q Samsung + Q² Samsung

4 Q + Q² A

= 4 + 2QA

Then 200 - QA - QS = 4 + 2QA

Take like terms

3QA + QS = 196 --- eqn 1

For samsung we do the same thing till we arrive at

QA + 3QS = 196 --- eqn 2

Solve eqn 1 and 2 simultaneously

We would have QA = 49 and Qs = 49

Total output is the addition of both values

49 + 49 = 98

How to solve for total output

https://brainly.com/question/25109150

#SPJ1

Haylock Inc. bases its manufacturing overhead budget on budgeted direct labor-hours. The direct labor budget indicates that 7,800 direct labor-hours will be required in August. The variable overhead rate is $1.20 per direct labor-hour. The company's budgeted fixed manufacturing overhead is $100,560 per month, which includes depreciation of $8,790. All other fixed manufacturing overhead costs represent current cash flows. The August cash disbursements for manufacturing overhead on the manufacturing overhead budget should be:

Answers

Answer:

Total cash= $101,130

Explanation:

Giving the following information:

Estimated direct labor hours=  7,800

The variable overhead rate is $1.20 per direct labor-hour.

The company's budgeted fixed manufacturing overhead is $100,560 per month, which includes depreciation of $8,790.

We need to deduct the depreciation expense because it is not a cash disbursement.

Cash disbursement:

Variable overhead= 7,800*1.2= $9,360

Fixed overhead= (100,560 - 8,790)= $91,770

Total cash= $101,130

what is Economics in simple terms​

Answers

Answer:

The New York Stock Exchange in New York City, USA. Economics is the social science which studies economic activity: how people make choices to get what they want. It has been defined as "the study of scarcity and choice" and is basically about the choices people make.

Explanation:

can i get brainliest

Wholemark is an Internet order business that sells one popular New Year greeting card once a year. The cost of the paper on which the card is printed is $0.40 per card, and the cost of printing is $0.10 per card. The company receives $3.75 per card sold. Since the cards have the current year printed on them, unsold cards have no salvage value. Their customers are from the four areas: Los Angeles, Santa Monica, Hollywood, and Pasadena. Based on past data, the number of customers from each of the four regions is normally distributed with mean 2,300 and standard deviation 200. (Assume these four are independent.)
What is the optimal production quantity for the card?

Answers

Answer:

≈ 9644 quantity of card

Explanation:

given data:

n = 4 regions/areas

mean demand = 2300

standard deviation = 200

cost of card (c) = $0.5

selling price (p) = $3.75

salvage value of card ( v ) = $ 0

The optimal production quantity for the card can be calculated using this formula below

= u + z (0.8667  ) * б

= 9200  +  1.110926 * 400

≈ 9644 quantity of card

First we have to find u

u = n * mean demand

 = 4 * 2300 = 9200

next we find the value of Z

Z = ( \(\frac{p-c}{p-v}\) )

   = ( 3.75 - 0.5 ) / 3.75   = 0.8667

Z( 0.8667 ) = 1.110926 ( using  excel formula : NORMSINV (0.8667 )

next we find б

б = 200\(\sqrt{n}\) = 400

The following account balances appear in the 2021 adjusted trial balance of Blue Devils Corporation: Cash, $4,700; Accounts Receivable, $8,700; Supplies, $18,700; Equipment, $117,000; Accumulated Depreciation, $43,500; Accounts Payable, $25,700; Salaries Payable, $15,700; Common Stock, $57,000; and Retained Earnings,. Prepare the December 31, 2021, classified balance sheet including the correct balance for retained earnings. (Amounts to be deducted should be entered with minus sign.)

Answers

Answer:

Blue Devils Corporation balance sheet as at December 31, 2021

Non - Current Assets

Equipment,                                             $117,000

Less Accumulated Depreciation          ($43,500)

Total Non - Current Assets                    $73,500

Current Assets

Cash,                                                         $4,700

Accounts Receivable,                              $8,700

Supplies,                                                  $18,700

Total Current Assets                              $32,100

Total Assets                                          $105,600

Current Liabilities

Accounts Payable,                                 $25,700

Salaries Payable,                                    $15,700

Total Current Liabilities                          $41,400

Equity

Common Stock,                                     $57,000

Retained Earnings (Balancing Figure)    $7,200

Total Equity                                            $64,200

Total Equity and Liabilities                  $105,600

Explanation:

The Balance of retained earnings is determined by missing figure approach using the Accounting Equation : Assets = Liabilities + Equity.

Big Blue Rental Corporation provides rental agent services to apartment building owners. Big Blue Rental Corporation’s preliminary income statement for August 2022 and its August 31, 2022, preliminary balance sheet did not reflect the following: Rental commissions of $690 had been earned in August but had not yet been received from or billed to building owners. When supplies are purchased, their cost is recorded as an asset. As supplies are used, a record of those used is kept. The record sheet shows that $550 of supplies were used in August. Interest on the note payable is to be paid on May 31 and November 30. Interest for August has not been accrued—that is, it has not yet been recorded. (The Interest Payable of $100 on the balance sheet is the amount of the accrued liability at July 31.) The interest rate on this note is 10%. Wages of $450 for the last week of August have not been recorded. The Rent Expense of $1,590 represents rent for August, September, and October, which was paid early in August. Interest of $470 has been earned on notes receivable but has not yet been received. Late in August, the board of directors met and declared a cash dividend of $4,700, payable September 10. Once declared, the dividend is a liability of the corporation until it is paid. Required: Using the columns provided on the income statement for Big Blue Rental Corporation, make the appropriate adjustments or corrections to the statements, and enter the correct amount in the Final column. (Hint: Use the five questions of transaction analysis.) Using the columns provided on the balance sheet for Big Blue Rental Corporation, make the appropriate adjustments or corrections to the statements, and enter the correct amount in the Final column. (Hint: Use the five questions of transaction analysis.)

Answers

Answer:

Explanation: Big Blue Rental Corp. provides rental agent services to apartment building owners. Big Blue Rental Corp.’s preliminary income statement for August 2016 and its August 31, 2016, preliminary balance sheet did not reflect the following:

Rental commissions of $1,500 had been earned in August but had not yet been received from or billed to building owners.

When supplies are purchased, their cost is recorded as an asset. As supplies are used, a record of those used is kept. The record sheet shows that $1,080 of supplies were used in August.

Interest on the note payable is to be paid on May 31 and November 30. Interest for August has not been accrued—that is, it has not yet been recorded. (The Interest Payable of $240 on the balance sheet is the amount of the accrued liability at July 31.) The interest rate on this note is 10%.

Wages of $780 for the last week of August have not been recorded.

The Rent Expense of $3,060 represents rent for August, September, and October, which was paid early in August.

Interest of $840 has been earned on notes receivable but has not yet been received.

Late in August, the board of directors met and declared a cash dividend of $8,400, payable September 10. Once declared, the dividend is a liability of the corporation until it is paid.

is karma real

good films on karma​

Answers

Karma the superstition is not real, however this is a subjective question.

Some good films relating to karma are:

"Cloud Atlas" (2012) - This science fiction film tells six interconnected stories set across different time periods, with the characters' actions and decisions influencing each other in the past, present, and future. The film explores the idea of reincarnation and the notion that our actions in one life can have consequences in the next.

"The Fountain" (2006) - This visually stunning film tells the story of a man's spiritual journey through three parallel stories set in different time periods. The film explores themes of death, rebirth, and the interconnectedness of all things, as the protagonist grapples with the idea of accepting his own mortality.

"The Adjustment Bureau" (2011) - This science fiction thriller follows a politician who discovers that his life is being controlled by a group of mysterious beings who plan out his every move. The film explores the idea that our choices and actions can have a profound impact on our future, and that we have the power to change our fate through our own decisions and willpower.

In 1995 Congressperson Bill Archer proposed that the income tax be replaced with a consumption tax. If his program had been passed, then today it is likely that the equilibrium interest rate

Answers

If income tax would have replaced with a consumption tax, then today it is likely that the equilibrium interest rate would be smaller, while the amount of loanable funds at equilibrium would be greater.

What is equilibrium interest rate?

The short-term real interest rate that, over the long term, is consistent with total output at its potential and stable inflation is known as the equilibrium real interest rate. At the interest rate where the supply and demand for money are equal, the money market reaches equilibrium. If all other factors remain constant, a change in money demand or supply will result in a change in the equilibrium interest rate, which will then change the size of real GDP and the level of prices.

To know more about equilibrium interest rate, click here- brainly.com/question/29909951

#SPJ4

WHAT IS Segmentation,

Answers

Answer:

Segmentation is to divide something into separate parts or sections

1.    You are the manager of a store that carries generic soft drinks. Due to a local economic boom, your customers’ incomes are forecasted to rise by ten percent during the next month. The income elasticity of demand for these products is estimated to be –1.5. Estimate the change in the quantity of your soft drink orders required to accommodate the new demand without a surplus or shortage of inventory (that is, how much will demand for the generic soft drinks change due to the increased income?).​

Answers

the modification in the volume of your soft drink orders necessary to satisfy the new demand without a surplus or lack of inventory You won't purchase something if you don't need or want it. Income is vital, as seen by ability to purchase. Due to their higher incomes, professors can frequently afford better housing and transportation than students.

What is meant by soft drink?

Water (frequently carbonated), a sugar, and a natural or artificial flavour are typically found in soft drinks. Sugar, high-fructose corn syrup, fruit juice, a sugar substitute (in the case of diet beverages), or a combination of these may be used as the sweetener. Caffeine, colorings, preservatives, and/or other substances are all possible additions to soft drinks.

In contrast to "hard" alcoholic drinks, soft drinks are referred to as such.

Learn more about soft drink, from :

brainly.com/question/13315399

#SPJ9

13) Consider the following information for a particular economy. Total population = 60 million Number of employed 30 million Total labour force = 40 million Natural rate of unemployment = 12% a) Find the total unemployment rate b) Calculate the cyclical unemployment rate​

Answers

Answer:

Explanation:

a) Find the total unemployment rate

Total labour force = 40 million

Number of employed = 30 million

Number of unemployed = 40 - 30 = 10 million

Unemployment rate = (unemployed / Labour force) × 100

Unemployment rate = (10 million / 40 million) × 100 = 25%

b) Calculate the cyclical unemployment rate​

Cyclical unemployment rate = Unemployment rate - natural rate of unemployment

Unemployment rate = 25%

Natural rate of unemployment = 12%

Cyclical unemployment rate = 25 - 12 = 13%

THESE ARE TRUE OR FALSE!! PLEASE HELP ASAP!! WILL MARK BRAINLIEST!!
1. Economic growth refers to a steady increase in the production of goods and services in an
economic system.
2. There are over 120 million workers in the U.S. economy.
3. The total dollar value of all final goods and services produced in a country during one year
is called the Gross Domestic Product (GDP).
4. The GDP in our economy has declined steadily for the past few years.
5. The base year used in comparing GDPs adds confusion to the comparison.
6. GDP per capita is found by dividing total GDP by the total work force.
7. Both worker training and management techniques have helped improve our productivity.
8. Changes in the business cycle form a pattern of good times to bad times and back.
9. When the economy slows down, it enters a phase of the business cycle known as recession.
10. Recovery in the business cycle occurs after a period of inflation.

Answers

true

t

Explanation:

because many workers our undergo the trainings to manage the yechques to improve his self

When you see an advertisement for a store and decide to shop there, which element of the marketing mix has succeeded?
O Presentation
O Product
O Place
O Promotion

Answers

Answer:

Promotion

Explanation:

Because it is telling people that the product is ready for them to buy it

Determine the missing amount:
Assets=Liabilities+owners Equity x 272000 573000

Answers

Based on the given amounts of assets and liabilities, the missing amount of Owner's equity is $301,000

How to find the equity?

The Owners equity is one of the parts of the Accounting equation which is:

Assets = Liabilities + Owners Equity

The Assets in this instance is $573,000 and the Liabilities are $272,000.

The Owner's equity is the missing amount and it can be found as:

573,000 = 272,000 + Owners Equity

Owners Equity = 573,000 - 272,000

Owners Equity = $301,000

Find out more on owner's equity at https://brainly.com/question/28222828

#SPJ1

You might have heard about manufacturing jobs moving overseas on the news, in classes, or
from your parents. What do you think about this? Is it important to choose goods manufactured
in the United States or North America?|

Answers

Answer:United States

Explanation:because north america is in the united states

Answer:

I put

Explanation:

I think North America in a way because at times we need to trade in order to get things we need and don't have.

Si una empresa quiere saber porqué han decrecido sus ventas ¿Qué tipo de investigación realizaría cuantitativa o cualitativa? ¿Porqué?

Answers

Answer:

Cualitativa

Dado que están interesados en las razones (las cuales no son una variable numérica), la recopilación de información y la investigación será de tipo cualitativa para poder conocer las razones o motivos por los que la gente ha dejado de comprar.

Explanation:

En investigación hay dos tipos principales de métodos:

La investigación cuantitativa, que se basa en la recolección de datos y variables numéricas y la relación que existe entre ellas.La investigación cualitativa, la cual se base en la recolección de datos de tipo no numérico y que no pueden ser medidas con números (por ejemplo opiniones).

En este ejemplo la empresa quiere saber por qué han decrecido sus ventas, dado que están interesados en las razones (las cuales no son una variable numérica), la recopilación de información y la investigación será de tipo cualitativa para poder conocer las razones o motivos por los que la gente ha dejado de comprar.

1. By giving yourself a safety cushion on all sides of the vehicle you improve your ability to? 1. stop 2. maneuver 3. think 4. all of the above

Answers

Answer: 4

Explanation: All of the above

Given the points (-4,8) and (6,-12)

Answers

Answer:

N/A

Explanation:

What is the question. There is nothing to answer.

where is the question please put the question so we can help

Suppose the CPI was 110 last year and is 121 this year.



Instructions: In part a, enter your answer as a whole number. In part b, round your answer to 1 decimal place. If you are entering any negative numbers be sure to include a negative sign (-) in front of those numbers.



a. What is this year’s inflation rate?
____ %

b. In contrast, suppose that the CPI was 110 last year and is 108 this year. What is this year’s inflation rate?
____ %
c. What term do economists use to describe this second outcome?
Inflation or Deflation

Answers

The inflation rate is 10%, which can be computed the second answer is -1.8%. third outcome called deflation.

How to calculate CPI?

a) The formula to CPI is

\(CPI= \frac{current CPI-past CPI}{past CPI}\)

\(CPI= \frac{121-110}{110}\)

CPI= 0.1 or 10%

b) \(CPI= \frac{current CPI-past CPI}{past CPI}\)

\(CPI= \frac{108-110}{110}\)

CPI= -0.18%

A decrease in the economy's overall price level is referred to as deflation, whereas a temporary slowdown in price inflation is known as disinflation. A decrease in the money supply, reductions in government and consumer expenditure, and reductions in corporate investment can all contribute to deflation, which is bad for an economy.

A progressive drop in consumer prices for products and services is known as price deflation. This is frequently brought on by the deflationary gap, also referred to as the demand gap, which is characterized by high supply and low demand. Consumers and businesses hold on to their money rather than spending it because they anticipate a decrease in pricing.

To know about consumer price index visit:

brainly.com/question/3870930

#SPJ1

Other Questions
In negative frequency-dependent selection, the fitness of a genotype ______ when its frequency becomes higher. Put this in order please US Constitution-American Revolutionary War-Jamestown, VirginiaArticles of ConfederationMagna CartaDeclaration of Independence Use the distributive property to evaluate 4(2x 1) when x = 5.O4O 39O 32O 36 What is the length of one side of a cube that has a surface area of 1,734 square mm? How does buying in bulk reduce waste? This is for science someone please help me ASAP Ill give you brainlest the words are evaporation, sublimation, condensation, precipitation, runoff, transpiration, and infiltration Which expression is equivalent to 10/9? Which subtraction expression has the difference 1 4i? (2 6i) (1 2i) (2 6i) (1 2i) (3 5i) (2 i) (3 5i) (2 i) Which of these statements MOST accurately describes Hotelling's Law? Competing businesses are likely to be drawn toward a center point in order to minimize the advantages that location might grant to their competitors. As businesses move away from a zone of profitability, distance decay reduces profitability as the business is in a zone where consumers will not travel. A prime location for a business is where demand for a certain retail good is high enough to generate revenues that exceed the costs of doing business there. Location theory considers factors such as workforce availability, education, and community culture and appeal. Inequalities between the core and periphery keep core countries economically developed and periphery countries undeveloped. If f(a)=4a-5 what is f(3)-f(1.25)a. -8b. 7c. 17d. 32 Why does Creon order Antigone to be killed? what is 0.33 as a fraction and percent PLS HURRY WILL GIVE BRAINLIEST Which of these is the correct amino acid and chain produced from the dna template strand Who is travelling the fastest? Mick runs 120 m in 20 seconds. Sally rides 700 m in 1 minute. Udhav jogs 2000 m in 5 minutes. Select yes or no for each statement using the table below! Which were the countries involved against Paraguay in the Triple Alliance War? Argentina, Uruguay and Chile O Argentina, Brazil and Uruguay O Argentina, Brazil and Bolivia O Argentina, Brazil and Panama PLS HELPPPPP From which of the following body sites has microbial DNA been detected, but microbes have not been definitively observed? can someone help me really please