There are two basic methods for reducing schedules: - Reducing the time spent on crucial activities or tasks by increasing the number of resources or altering their scope.
What is duration in critical path method?The first activity has a start time of 0 and an end time that corresponds to its duration. The start time of the subsequent action is equal to its finish time, and its end time is equal to its beginning time plus its duration.By running tasks concurrently or overlapping them, you can complete tasks more quickly. To complete a project on time, it is crucial to update the information on the timetable.Cutting down on the time between tasks, By conducting processes concurrently rather than in order, fast-tracking a project reduces the schedule. Crashing is a practise that involves spending more money to shorten time, scope reductionAs a result, the project manager frequently aims to reduce the critical path. A project may be completed sooner if its duration is reduced.To learn more about Reducing refer to:
https://brainly.com/question/967253
#SPJ4
(0)
Write a grading program for an instructor whose course has the following policies:
* Two quizzes, each graded on the basis of 10 points, are given.
* One midterm exam and one final exam, each graded on the basis of 100 points,
are given.
* The final exam counts for 40 percent of the grade, the midterm counts for 35 percent, and the two quizzes together count for a total of 25 percent. (Do not forget to normalize the quiz scores. They should be converted to percentages before they are averaged in.)
Any grade of 90 percent or more is an A, any grade between 80 and 89 percent is a B, any grade between 70 and 79 percent is a C, any grade between 60 and 69 percent is a D, and any grade below 60 percent is an F.
The program should read in the student's scores and display the student's record, which consists of two quiz scores, two exam scores, the student's total score for the entire course, and the final letter grade. The total score is a number in the range 0-100, which represents the weighted average of the student's work.
Create a method for input that both prompts for input and checks to make sure the grades are in an appropriate range. Use a while loop to get another input value until the grade is in range.
The grading program for an instructor whose course has following policies are given below : import java.util.Scanner;
Programming :import java.util.Scanner;
public class Student{
Scanner in = new Scanner(System.in);
String name;
double quiz1, quiz2, midTerm, finalTerm, grade;
void readInput(){
System.out.print("Enter student's name: ");
name = in.nextLine();
while(true){
System.out.print("Enter the grades in quiz 1: ");
quiz1 = in.nextDouble();
if(quiz1 < 0 || quiz1 > 10) System.out.print("Invalid grade.");
else break;
}
while(true){
System.out.print("Enter the grades in quiz 2: ");
quiz2 = in.nextDouble();
if(quiz1 < 0 || quiz1 > 10) System.out.print("Invalid grade.");
else break;
}
while(true){
System.out.print("Enter the grades in mid term: ");
midTerm = in.nextDouble();
if(midTerm < 0 || midTerm > 100) System.out.print("Invalid grade.");
else break;
}
while(true){
System.out.print("Enter the grades in final term: ");
finalTerm = in.nextDouble();
if(finalTerm < 0 || finalTerm > 100) System.out.print("Invalid grade.");
else break;
}
}
void calculateGrade(){
grade = (quiz1 + quiz2) * 1.25 + midTerm * 0.25 + finalTerm * 0.5;
}
void writeOutput(){
System.out.println("\n\nStudent " + name + "\n" + "had these scores");
System.out.println("First quiz " + quiz1 + "\nSecond quiz " + quiz2);
System.out.println("Midterm exam " + midTerm + "\nFinal exam " + finalTerm);
System.out.print("the total score is " + grade + "\nthe letter grade is ");
if(grade >= 90) System.out.println("\"A\"");
else if(grade >= 80) System.out.println("\"B\"");
else if(grade >= 70) System.out.println("\"C\"");
else if(grade >= 60) System.out.println("\"D\"");
else System.out.println("\"F\"");
}
}
// StudentDemo.java
import java.util.Scanner;
public class StudentDemo{
public static void main(String[] args){
Scanner scan = new Scanner(System.in);
Student person = new Student();// one Student
int numberOfStudents, i;
System.out.print("Enter number of Students:");
numberOfStudents = scan.nextInt();
for(i = 0; i < numberOfStudents; i++){
person.readInput();
person.calculateGrade();
person.writeOutput();
}
}
}
Complete Program to copy :<terminated> Student Demo [Java Application] /opt/eclipse/jre/bin/java (30-Jul-2014 9:54:37 am)
Enter number of Students:1
Enter student's name: John J Smith
Enter the grades in quiz 1: 7
Enter the grades in quiz 2: 8 Enter the grades in mid term: 90
Enter the grades in final term: 80
Student John J Smith
had these scores
First quiz 7.0
Second quiz 8.0
Midterm exam 90.0
Final exam 80.0
the total score is 81.25
the letter grade is "B"
What does the grading system aim to accomplish?
A grading system's primary purpose is to evaluate a student's academic performance. This method, which is used in schools all over the world, is thought to be the best way to test a child's grasping and reciprocating skills.
Incomplete question :
Write a grading program for an instructor whose course has the following policies:
* Two quizzes, each graded on the basis of 10 points, are given.
* One midterm exam and one final exam, each graded on the basis of 100 points, are given.
* The final exam counts for 50 percent of the grade, the midterm counts for 25 percent, and the two quizzes together count for a total of 25 percent. (Do not forget to normalize the quiz scores. They should be converted to percentages before they are averaged in.)
Any grade of 90 percent or more is an A, any grade between 80 and 89 percent is a B, any grade between 70 and 79 percent is a C, any grade between 60 and 69 percent is a D, and any grade below 60 percent is an F.
The program should read in the student's scores and display the student's record, which consists of two quiz scores, two exam scores, the student's total score for the entire course, and the final letter grade. The total score is a number in the range 0-100, which represents the weighted average of the student's work.
Create a method for input that both prompts for input and checks to make sure the grades are in an appropriate range. Use a while loop to get another input value until the grade is in range.
import java.util.Scanner;
public class StudentDemo
{
public static void main(String[] args)
{
Scanner scan = new Scanner(System.in);
Student person = new Student ();// one Student
int number Of Students, i;
System.out.println("Enter number of Students:");
number Of Students = scan.nextInt( );
for(i = 0; i < number Of Students; i++)
{
person.read Input();
person.calculateGrade();
person.writeOutput();
}
}
}
/* sample output with numbers that are accurately computed:
Student John J Smith
had these scores
First quiz 7
Second quiz 8
Midterm exam 90
Final exam 80
the total score is 81.25
the letter grade is "B" */
Learn more about Grading program :
brainly.com/question/29497404
#SPJ4
a data warehouse is a _______ collection of information, gathered from many different ________ databases, that supports business analysis and decision-making tasks.
A data warehouse is a logical collection of information, gathered from many different operational databases, that supports business analysis and decision-making tasks.
What is data warehouse?
A data warehouse is a type of database that stores large amounts of historical data from multiple operational databases. It is used to support decision-making processes by providing a single source of data that can be accessed by multiple users. Data warehouses are designed to store large amounts of data over an extended period of time and are typically used to store data that is not subject to frequent changes. This makes them ideal for businesses seeking to analyze trends over long periods of time or to compare data across multiple sources. Data warehouses typically contain data from multiple sources and can range from a few gigabytes to multiple terabytes. They are also designed to provide fast query performance and are usually optimized for data analysis. Data warehouses are used for a variety of purposes, including predictive analytics, customer segmentation, and fraud detection.
To learn more about data warehouse
https://brainly.com/question/28716091
#SPJ4
Question 11 (2.5 points)
A start-up company has hired you to implement an email strategy for its organization.
The company wants all of its employees to have an enterprise-level email client and
is considering Windows Live Essentials. They ask you if there are any limitations
about this email solution. Which of the following is a major limitation?
Answer:
the dot
Explanation:
the dot is a good day forecast for a bit
C++
Write a program and use a for loop to output the
following table formatted correctly. Use the fact that the
numbers in the columns are multiplied by 2 to get the
next number. You can use program 5.10 as a guide.
Flowers
2
4
8
16
Grass
4
8
16
32
Trees
8
16
32
64
based on the above, we can write the C++ code as follows..
#include <iostream>
#include <iomanip>
using namespace std;
int main() {
// Output table headers
cout << setw(10) << "Flowers" << setw(10) << "Grass" << setw(10) << "Trees" << endl;
// Output table rows
for (int i = 1; i <= 4; i++) {
cout << setw(10) << (1 << (i-1)) * 2 << setw(10) << (1 << i) * 2 << setw(10) << (1 << (i+2)) * 2 << endl;
}
return 0;
}
How does this work ?Using the iomanip library's setw function, we ensure that the output of this program is properly formatted and aligned in columns. To calculate the values in each column, we iterate through every row of the table via a for loop and rely on bit shifting and multiplication.
As our code outputs these values to the console using << operators, we use endl to create new lines separating each row. The return 0; statement at the very end serves as an indication of successful completion.
Learn more about C++:
https://brainly.com/question/30905580
#SPJ1
Kevin needs to get his data from a database into a text file to send to another group. He needs to _____.
A. export
B. sort
C. link
D. import
Answer:
pretty sure that it would be A. Export :)
----------------------------------------------------------------------------------------------------------------
Explanation:
Because B and C don't make too much sense, and D would mean to 'bring in' and A means the opposite, which is take out.
What type of light comes from reflections off other objects?
In C#
Please as soon as possible
Answer:
I'm not hundred percent sure but I believe it is going up by 100 the scale each number for the total quantity
Explanation:
Statistics are often calculated with varying amounts of input data. Write a program that takes any number of non-negative integers as input, and outpu
Answer:
Explanation:
The following program is written in Java and is a function that asks the user for an input and keeps doing so until a negative value is entered, in which case it calculates the average and max values and prints it to the screen.
public static void average () {
int num;
int sum = 0;
Scanner in = new Scanner(System.in);
System.out.println("Enter Number");
num = in.nextInt();
int count = 0;
int max = 0;
while(num >= 0)
{
sum+=num;
System.out.println("Enter Number");
num = in.nextInt();
count++;
if(num>=max){
max = num;
}
}
System.out.println(sum/count);
System.out.println(max);
}
Answer:hi
Explanation:
Which of the following if statements uses a Boolean condition to test: "If you are 18 or older, you can vote"? (3 points)
if(age <= 18):
if(age >= 18):
if(age == 18):
if(age != 18):
The correct if statement that uses a Boolean condition to test the statement "If you are 18 or older, you can vote" is: if(age >= 18):
In the given statement, the condition is that a person should be 18 years or older in order to vote.
The comparison operator used here is the greater than or equal to (>=) operator, which checks if the value of the variable "age" is greater than or equal to 18.
This condition will evaluate to true if the person's age is 18 or any value greater than 18, indicating that they are eligible to vote.
Let's analyze the other if statements:
1)if(age <= 18):This statement checks if the value of the variable "age" is less than or equal to 18.
However, this condition would evaluate to true for ages less than or equal to 18, which implies that a person who is 18 years old or younger would be allowed to vote, which is not in line with the given statement.
2)if(age == 18):This statement checks if the value of the variable "age" is equal to 18. However, the given statement allows individuals who are older than 18 to vote.
Therefore, this condition would evaluate to false for ages greater than 18, which is not correct.
3)if(age != 18):This statement checks if the value of the variable "age" is not equal to 18.
While this condition would evaluate to true for ages other than 18, it does not specifically cater to the requirement of being 18 or older to vote.
For more questions on Boolean condition
https://brainly.com/question/26041371
#SPJ8
Alejandra is using a flash drive that a friend gave to her to copy some financial records from the company database so she can complete a department presentation at home. She does not realize that the flash drive is infected with a virus that enables a malicious hacker to take control of her computer. This is a potential __________ to the confidentiality of the data in the files
Answer:
maybe threat?
Explanation:
please answer urgently. See the attached image
Based on the information, the tight upper bound for T(h) is O(h).
How to explain the informationThe algorithm visits at most x children in line 3, where x is the number of keys in the current node.
T(h) ≤ T(h-1) + x
For a B-Tree of height 0, i.e., a single node, the algorithm just compares the key with the node key and returns. Therefore, T(0) = Θ(1).
We can express T(h) as a sum of terms of the form T(h-i) for i = 1 to h:
T(h) ≤ T(h-1) + x
T(h-1) ≤ T(h-2) + x
T(h-2) ≤ T(h-3) + x
...
T(2) ≤ T(1) + x
T(1) ≤ T(0) + x
Adding all these inequalities, we get:
T(h) ≤ T(0) + xh
Substituting T(0) = Θ(1), we get:
T(h) = O(h)
Therefore, the tight upper bound for T(h) is O(h).
Learn more about upper bound on
https://brainly.com/question/28725724
#SPJ1
The value u+203e belongs to which coding system
The value "u+203e" belongs to the Unicode coding system.
How is this so?Unicode is a universal character encoding standard that assigns unique numeric codes to characters from various writing systems,including alphabets, ideographs, symbols, and more.
The "u+203e" value specifically refers to a Unicode code point, which represents the character "OVERLINE." Unicode ensures consistency in representing and exchanging text across different platforms, programming languages, and systems.
Learn more about coding at:
https://brainly.com/question/27639923
#SPJ1
Brief note on current generation of Intel CPU
The cutoff in September 2021, the current generation of Intel CPUs is the 11th generation, also known as Intel Core "Tiger Lake" processors. These CPUs were introduced in late 2020 and are based on Intel's 10nm SuperFin process technology.
The 11th generation Intel Core CPUs bring several improvements over their predecessors. They offer enhanced performance, improved power efficiency, and advanced features for both laptops and desktops. The CPUs feature higher core counts, increased clock speeds, and improved integrated graphics performance.
One notable feature of the 11th generation CPUs is the introduction of Intel Iris Xe graphics, which deliver significant graphics performance improvements compared to previous generations. This makes them suitable for gaming, content creation, and other graphics-intensive tasks without the need for a dedicated graphics card.
Additionally, the 11th-generation CPUs include support for technologies like Thunderbolt 4, Wi-Fi 6, and PCIe 4.0, providing faster connectivity and data transfer speeds. They also come with improved AI capabilities, which enable features like AI-based noise reduction, video upscaling, and better voice recognition.
It's important to note that Intel continues to innovate and release new CPU generations beyond the 11th generation. Therefore, for the most up-to-date information on the current generation of Intel CPUs, it is recommended to refer to official Intel documentation or visit Intel's website for the latest product offerings and specifications.
For more questions on Intel CPU
https://brainly.com/question/30196858
#SPJ11
Describe five examples of civil engineering projects.
Answer:
Hereare 5 types of civil engineering projects:
1 )Water engineering.
2)Construction and management engineering.
3)Structural engineering.
4)Geotechnical engineering.
5)Transport engineering.
What are some characteristics of pseudocode? Check all that apply. Pseudocode is an informal way of expressing ideas and algorithms during the development process. Pseudocode uses simple and concise words and symbols to represent the different operations of the code. Pseudocode can be used to express both complex and simple processes. Pseudocode can be executed as a software program.
Answer:
all but the last one
The pseudocode have the characteristics of expressing ideas and algorithms in the developmental process, uses simple and concise words for varying code operations, and express both complex and simple processes. Thus, options A, B, and C are correct.
What is a pseudocode?A pseudocode in computer science can be given as the language description of the steps that are used in algorithm. They are comprised with the text based and are straightforward.
The characteristics of pseudocode are:
Pseudocode is an informal way of expressing ideas and algorithms during the development process.Pseudocode uses simple and concise words and symbols to represent the different operations of the code.Pseudocode can be used to express both complex and simple processesThus, options A, B, and C are correct.
Learn more about pseudocode, here:
https://brainly.com/question/13208346
#SPJ2
Assume the existence of an interface, GUIComponent with the following methods: - open and close: no parameters, returns boolean - move and resize: accepts two integer parameters and returns void Define a class, Window, that implements the GUIComponent interface, and has the following members: - width, height, xPos, and yPos integer instance variables, with xPos and yPos initialized to 0 - a constructor that accepts two integer variables (width followed by height) which are used ti initialize the width and height instance variables - An implementation of open: that sends "Window opened" to System.out, and returns true - An implementation of close that sends "Window closed" to System.out, and returns true - An implementation of resize that modifies the width and height variables to reflect the specified size - An implementation of move that modifies xPos and yPos to reflect the new position
The implementation is as follow,
public class Window implements GUIComponent {
private int width:
private int height;
private int xPos;
private int yPos;
public Window(int width, int height) {
xPOS = 0;
yPos = 0;
this.width = width;
this.height = height;
}
public boolean open() {
System.out.printIn("Window opened");
return true:
}
public boolean close() {
System.out.println("Window closed');
return true;
}
public void resize(int wid, int hei) {
width = wid;
height = hei;
}
public void move(int ×, int y){
xPos = x;
yPos = y;
}
}
Learn more about such codes here https://brainly.com/question/14492046
#SPJ10
Additional rows and columns are inserted into a table using the
tab.
o Table Tools Design
o Insert Table
o Table Tools Layout
o Table Tools Insert
I have no idea what I’m doing and this is due in 45 minutes
Answer:
Not enough info...
Explanation:
Use the drop-down menus to complete statements about how to use the database documenter
options for 2: Home crate external data database tools
options for 3: reports analyze relationships documentation
options for 5: end finish ok run
To use the database documenter, follow these steps -
2: Select "Database Tools" from the dropdown menu.3: Choose "Analyze" from the dropdown menu.5: Click on "OK" to run the documenter and generate the desired reports and documentation.How is this so?This is the suggested sequence of steps to use the database documenter based on the given options.
By selecting "Database Tools" (2), choosing "Analyze" (3), and clicking on "OK" (5), you can initiate the documenter and generate the desired reports and documentation. Following these steps will help you utilize the database documenter effectively and efficiently.
Learn more about database documenter at:
https://brainly.com/question/31450253
#SPJ1
one image is 16384 pixels wide and 512 pixels high. He decides to save it as a 256 color bitmap image. Calculate the file size in Gib
The file size would be 0.268435456 gb
What is a File Size?This refers to the capacity of a file to store information in it and is a function of memory in computers.
Calculations and ParametersGiven that:
There is a 256 color bitmap image.
The pixel dimensions are: 16384 pixels wide and 512 pixels high (16384 x 512)
To find the file size, this would be:
(16384 x 512 x 256)/8
= 268,435,456 bytes.
Then, to convert bytes to gigabytes and it would be 0.268435456 gb
Read more about digital imaging here:
https://brainly.com/question/26307469
#SPJ1
When preparing the heading for an MLA Format Academic Report, which of the following shows the proper order of the for lines of the header?
A. Student Name, Instructor, Course, Date
B. Instructor, Course, Student Name, Date
C. Course, Student Name, Instructor, Date
D. Student name, Date, Instructor, Course
Answer:
A. Student Name, Instructor, Course, Date
Explanation:
Begin one inch from the top of the first page and flush with the left margin. Type your name, your instructor's name, the course number, and the date on separate lines, using double spaces between each. Double space once more and center the title
For connection to place on any network you must have a set of standards?
O True
O False
Answer:
false
Explanation:
false i just looked into it
Homework 8 Matlab Write a function called fibonacciMatrix. It should have three inputs, col1, col2, and n. col1 and col2 are vertical arrays of the same length, and n is an integer number greater than 2. It should return an output, fib, a matrix with n columns. The first two columns should be col1 and col2. For every subsequent column:
In this exercise we have to use the knowledge in computational language in python to write the following code:
We have the code can be found in the attached image.
So in an easier way we have that the code is:
function v = myfib(n,v)
if nargin==1
v = myfib(n-1,[0,1]);
elseif n>1
v = myfib(n-1,[v,v(end-1)+v(end)]);
end
end
function v = myfib(n,v)
if nargin==1
v = myfib(n-1,[0,1]);
elseif n>1
v = myfib(n-1,[v,v(end-1)+v(end)]);
elseif n<1
v = 0;
end
function [n] = abcd(x)
if (x == 1 || x==0)
n = x;
return
else
n = abcd(x-1) + abcd(x-2);
end
end
fibonacci = [0 1];
for i = 1:n-2
fibonacci = [fibonacci fibonacci(end)+fibonacci(end-1)];
end
>> myfib(8)
ans =
0 1 1 2 3 5 8 13
>> myfib(10)
ans =
0 1 1 2 3 5 8 13 21 34
See more about python at brainly.com/question/18502436
Which of the following should be the first page of a report?
O Title page
Introduction
O Table of contents
Terms of reference
Answer:
Title page should be the first page of a report.
hope it helps!
1.ShoppingBay is an online auction service that requires several reports. Data for each auctioned
item includes an ID number, item description, length of auction in days, and minimum required bid.
Design a flowchart or pseudocode for the following:
-a. A program that accepts data for one auctioned item. Display data for an auction only if the
minimum required bid is more than $250.00
The pseudocode for the program: Announce factors for the unloaded thing information, counting:
auction_id (numbers)
item_description (string)
auction_length (numbers)
minimum_bid (drift)
Incite the client to enter the auction_id, item_description, auction_length, and minimum_bid.
What is the pseudocode?The program acknowledges information for one sold thing, counting the auction_id, item_description, auction_length, and minimum_bid. It at that point checks in case the minimum_bid for the unloaded thing is more prominent than or rise to to $250.00.
The pseudocode for the program pronounces factors for the sold thing information and prompts the client to enter the information. At that point it employments an in the event that articulation to check in case the minimum_bid is more noteworthy than or break even with to 250.00.
Learn more about pseudocode from
https://brainly.com/question/24953880
#SPJ1
: "I have a customer who is very taciturn."
The client typically communicates in a reserved or silent manner
B. He won't speak with you.
Why are some customers taciturn?People who are taciturn communicate less and more concisely. These individuals do not value verbosity. Many of them may also be introverts, but I lack the scientific evidence to support that assertion, so I won't make any inferences or make conclusions of that nature.
The phrase itself alludes to the characteristic of reticence, of coming out as distant and uncommunicative. A taciturn individual may be bashful, naturally reserved, or snooty.
Learn more about taciturn people here:
https://brainly.com/question/30094511
#SPJ1
It's CSC 137 and it's chapter 4 but it's Due: Wednesday, February 22, 2023, 11:59 PM
I really need the answers ASAP
4. Suppose you have a class called Movie. Write a constructor for the class that initializes the title and director instance variables based on parameters passed to the constructor.
5. Suppose you have a class called Child with an instance data value called age. Write a getter method and a setter method for age.
The class that initializes the title and director instance variables based on parameters passed to the constructor is in explanation part.
What is programming?The process of carrying out a specific computation through the design and construction of an executable computer programme is known as computer programming.
The class that initializes the title and director instance variables based on parameters passed to the constructor is:
Public Movie (title, director)
{
title= new title;
director= new director;
}
The a class called Child with an instance data value called age is:
public void setAge(int new_Age) {
age = new_Age;
}
public int getAge(){
return age;
}
Thus, using this coding, one can get desired results.
For more details regarding programming, visit:
https://brainly.com/question/11023419
#SPJ1
Christopher was looking at the TV while getting feedback on his opinion essay. What should he do differently? Don't get feedback from a trusted adult. Finish watching his TV show. Make sure the trusted adult likes the show on TV, too. Turn off the TV and face the person who is speaking.
Answer:
Turn off the TV and face the person who is speaking.
What are the two parts of a cell reference? column intersection and row range column range and row intersection column letter and row number column number and row letter
Answer:
C - Column letter & row number
Answer: C
Explanation:
Describe a cellular network, its principle
components and how it works.
A cellular network is a contact network with a wireless last connection. The network is divided into cells, which are served by at least one fixed-location transceiver station each. These base stations provide network coverage to the cell, which can be used to send voice, data, and other types of information. It's often referred to as a mobile network.
The principal components of the cellular network will be explained below as follows-
BTS (Base Transceiver Station) - It is the most important part of a cell since it links subscribers to the cellular network for data transmission and reception. It employs a network of antennas that are dispersed across the cell.
BSC (Basic Station Controller) - It is a portion that interfaces between Basic Station Controllers and is connected to Basic Station Controllers via cable or microwave links, as well as routing calls between Basic Station Controllers and the MSC (Mobile Switching Center).
MSC (Mobile Switching Center) - The supervisor of a cellular network is linked to several Basic Station Controllers and routes cells between them. It also connects the cellular network to other networks such as the PSTN through fiber optics, microwave, or copper cable.
A cellular network works when the SIM card is organized into geographical cells, each of which has an antenna that transmits to all mobile phones in the city, cellular networks operate by knowing the exact location, which comes from the SIM card. A transmitter generates an electrical signal, which is converted by the transmit antenna into an electromagnetic wave, which is then radiated, and the RF wave is then converted back into an electrical signal. In cellular network networks, four multiple access schemes are used, ranging from the first analog cellular technologies to the most modern cellular technologies.